C2-Dimako
- Construction of a new raw water intake, installation of raw water pumps and laying of a 150 m HDPE OD 110 raw water main
- Construction of a treatment plant in concrete (30 m³/h)
- Construction of a 70 m³ treated water slab
- Construction of the pump room and installation of the treated water pumping
- Laying of a 2,000 m HDPE OD 110 treated water main
- Construction of a 300 m³ elevated tank
- Construction of a 1,000 m MV electrical line and installation of a100 kVA transformer
- Densification of the distribution network with laying of 3,000 m HDPE OD 160 and 5,000 m HDPE OD 110 pipes
- Construction of the operator’s office.