C2-Yoko
- Construction and equipment of 4 boreholes (7 m³/h each).
- Densification of the distribution network with laying of 11 km HDPE pipes (OD 110 and OD 90).
- Laying of a 3,200 m HDPE OD 160 treated water main.
- Construction of the treatment (disinfection) unit, with hydromechanical and electrical connections.
- Construction of a new 200 m³ storage tank in reinforced concrete.
- Construction of a 4 km MV electrical line and installation of a 100 kVA transformer.
- Construction of technical buildings.
- Construction of the operator’s office.