T1-Douala Wouri

admin/uploads/blog/813527ba4e75e97004a35955c6baca70.jpg

T1-Douala Wouri

  • Design and replacement of a 30-year-old ductile iron transmission pipe (length = 720m) under the Wouri bridge by OD 400 SDR11 HDPE pipe (electro-fusion couplings)

  • Date Started: 2011-02-01
  • Date Completed:2012-07-01
  • Location: Cameroon
  • Category: Construction
  • Tag: Borehole