T2-Buea
- Construction of a river weir;
- Construction of a raw water pumping station, 1 + 1 pumps, 220 m3/h at 110 m
- Construction and laying of a 3 km HDPE main pipe OD 355 – SDR 11
- Rehabilitation of the Mosel Spring treatment station and extension of its production capacity (150 m³/h to 370 m³/h)
- Rehabilitation of the treated water pumping station (1 + 1 pumps, 115 m3/h at 150 m)