T5-Okola
- Rehabilitation of the intake and the raw water pumping station.
- Rehabilitation of the treatment plant and extension of its capacity (25 m³/h).
- Rehabilitation of the treated water pumping station and reinstallation of the hydro-mechanical equipment on the treated water main towards the elevated tank.
- Rehabilitation of the elevated tank.
- Reinforcement of the electrical line MV/LV and installation of a 100 kVA transformer at the treatment plant.