T5-Akonolinga
- Rehabilitation of the intake and the raw water pumping station
- Rehabilitation of the treatment plant (88 m³/h)
- Rehabilitation of the treated water pumping station and reinstallation of the hydro-mechanical equipment on the treated water main towards the elevated tank
- Rehabilitation of the elevated tank
- Reinforcement of the electrical line MV/LV and installation of a 100 kVA transformer at the treatment plant.